Homepage / Projects / High-Precision Core Drilling at Iron Arc, 8 Kippax St, Surry Hills

High-Precision Core Drilling at Iron Arc, 8 Kippax St, Surry Hills

Background

Iron Arc, a specialist contractor, provided extensive core drilling services for a multi-level commercial building located at 8 Kippax St, Surry Hills, as part of its infrastructure upgrades. The project involved drilling 1000 precision core holes across multiple floors to facilitate mechanical, electrical, and plumbing (MEP) installations, essential for the building’s ongoing development.

To ensure high-precision concrete cutting and drilling, Perfect Concrete Care, a leading specialist in commercial core drilling, was engaged to execute the project while adhering to the highest safety, compliance, and operational standards in a live construction environment.

Challenges

The project presented multiple challenges that had to be carefully managed to ensure a seamless, efficient, and safe core drilling process:

  1. Live Site Operations: Conducting high-volume core drilling in an active building required the creation of multiple exclusion zones to maintain safety and prevent disruptions to tenants and ongoing construction activities.
  2. Stringent Safety Compliance: Perfect Concrete Care had to collaborate closely with the principal contractor to ensure adherence to worksite safety regulations, dust control, and risk mitigation strategies.
  3. Tight Project Timeline: With the client’s installation phase scheduled immediately after drilling, the team had to deploy an expanded workforce and advanced diamond core drilling equipment to accelerate the process and meet the project’s deadlines.

Solution

To overcome these challenges, Perfect Concrete Care implemented a strategic, high-efficiency core drilling plan tailored for multi-level commercial projects:

  1. Safety-First Approach: Established clearly marked exclusion zones and implemented dust suppression systems to maintain a safe and compliant working environment.
  2. Advanced Core Drilling Technology: Utilised high-powered diamond-tipped core drills for precision concrete cutting, ensuring clean and accurate core holes for seamless HVAC, electrical, and plumbing installations.
  3. Workforce Optimisation: Deployed a specialised team of core drilling experts to fast-track the work and get ahead of schedule, ensuring the client’s installation timeline remained unaffected.
  4. Seamless Coordination: Maintained continuous collaboration with the principal contractor, ensuring work progression aligned with the overall construction timeline and other subcontractor activities.

Results

  • Precision Execution: Successfully completed 1000 core holes with high-accuracy drilling techniques, ensuring clean and properly aligned penetrations for MEP installations.
  • Superior Safety Standards: Maintained strict worksite safety compliance, reducing risks through controlled exclusion zones, dust suppression, and hazard management.
  • Zero Delays to Installation Phase: The accelerated drilling process ensured the client’s subsequent installation phase could commence immediately and without disruption.
  • Minimal Impact on Building Operations: Careful scheduling and execution led to negligible disruptions to tenants and construction activities.
  • Client Satisfaction & Project Success: Delivered on-time, high-quality core drilling services, reinforcing Perfect Concrete Care’s reputation as a leader in commercial concrete cutting and core drilling.

Outcome

Through meticulous planning, high-precision drilling techniques, and a commitment to safety and efficiency, Perfect Concrete Care successfully delivered a complex, large-scale core drilling project at Iron Arc, 8 Kippax St, Surry Hills. This project showcases Perfect Concrete Care’s expertise in delivering top-tier core drilling and concrete cutting solutions in high-demand commercial construction environments. The seamless execution has enabled the smooth continuation of mechanical, electrical, and plumbing installations, contributing to the building’s overall structural and operational efficiency.

  • Client
    Iron Arc
  • Location
    8 Kippax St, Surry Hills
  • Duration
    3 weeks