Commercial Polished Concrete for a Gym Fitout, Oran Park
Client: commercial fitout builder (confidential). Location: Oran Park NSW. Scope: commercial polished concrete, about 310 square metres of exposed aggregate floor ground, grouted, densified, polished to 200 grit, sealed and burnished. Status: completed in one working week, November 2026. Commercial polished
Waterproofing Membrane Removal on a Hospital Plant Deck, Birtinya
The job Frank Cole Waterproofing was re-waterproofing a plant deck at a hospital in Birtinya on the Sunshine Coast. The deck carries condensers, fan units, pipework and steel plant frames, and the old coating had to come off back to clean
Commercial Strip Out in an Airport Terminal, Brisbane
The job Quadric is a Brisbane builder working on commercial interiors and base build refurbishments. For a refurbishment inside an operating airport terminal at Brisbane Airport, they needed a crew to strip out a row of self service bag drop units
Concrete Core Drilling and Grinding, Burleigh Heads
The job Insitu Group is a retail and commercial builder working across Victoria, Tasmania and Queensland. On a new restaurant build in Burleigh Heads they needed a concrete crew for the finishing details: slab edges to grind, kerbs to patch, and
Shop Strip Out and Floor Grinding, Fortitude Valley
The job Mettle Projects is a commercial builder with an office in Fortitude Valley. They brought Perfect Concrete Care in to strip out a ground floor shop in the Valley so a new fit out could go in. The old office
Concrete Floor Repairs at a Chemical Plant, Yatala
The job Agrichem makes liquid fertilisers at its plant in Yatala, between Brisbane and the Gold Coast. The site runs every day, with trucks, forklifts and product moving through the driveways and warehouses, so when the concrete needs fixing it has
Plant Deck Coating Removal, Coorparoo QLD
The job Plant deck coating removal on a multi level building in Coorparoo, Brisbane. The deck is a long, narrow roof level walkway between a blockwork parapet and the building face, with electrical kiosks, condensers and two concrete condenser plinths along
Roof Terrace Membrane Removal, The Oasis, Broadbeach
The job Roof membrane removal on the Level 3 roof terrace at The Oasis, Broadbeach, a block back from the beach on the Gold Coast. The terrace is a podium roof beside a glazed tenancy wall, with planters, plant rooms, ductwork
Tile, Waterproofing and Planter Membrane Removal, Mantra On View Hotel, Surfers Paradise QLD
The job Mantra On View is a high rise hotel on View Avenue in Surfers Paradise, a block back from the beach. Remcon Group, a Gold Coast remedial contractor, was re-waterproofing parts of the building: an outdoor deck, the level 4
Coring, Cutting and Grinding, 32 York Street Sydney
The job Ceerose brought Perfect Concrete Care onto 32 York Street in the Sydney CBD for coring, cutting, grinding and patching works across the fitout, floor by floor as the program progressed. The job ran from November 2023 to August 2024, roughly