Concrete Scarifying and Crack Injection on an Access Ramp, Murarrie
The job Epoca Constructions is a Brisbane builder working on civil, recreation and commercial projects. On a new public sports facility in Murarrie, they needed a curved, elevated concrete access ramp brought to a finished surface, and cracks in the concrete
Block Wall Demolition and Slab Saw Cutting, Nathan QLD
The job Saw cutting and block wall demolition on the ground floor of a university building on a campus in Nathan, Brisbane. Intrec Management was refurbishing the building and needed the old blockwork rooms and wet areas taken out, and sections
Coring and Scanning, USyd Mechanical Engineering Building
The job Watertight Group brought Perfect Concrete Care in to scan and core drill sections of the Mechanical Engineering Building at the University of Sydney, Camperdown, ahead of waterproofing works to the rooftop and balcony areas. The job ran from July 2025
Lift Shaft Door Cutting, State Library of New South Wales
The job Movilift Australia brought Perfect Concrete Care in to cut new lift shaft door openings at the State Library of New South Wales on Shakespeare Place, Sydney, as part of works to the building's lifts. The job ran from 12 to
Bronte Rock Pool Upgrade
Background The Bronte Rock Pool, located on Sydney's coastline, has been a favorite destination for both locals and tourists for decades. This iconic spot offers a scenic and relaxing atmosphere, making it a central part of the community. However, the pool
Concrete Repairs - Cumberland Council Pool
Perfect Concrete Care recently carried out complex concrete patching works on a public pool for Cumberland City Council. This aging pool was in poor disrepair, and as part of a new remediation project, Perfect Concrete Care was tasked with carrying
Floor Grinding & Epoxy Removal on Taronga Zoo Wharf
Central Coast Metal Protectives engaged Perfect Concrete Care to undertake floor grinding & epoxy removal on the Taronga Zoo wharf. This job happened in 2 stages. As one side of the wharf was closed for each stage of the job so
Sydney International Airport, T1
Perfect Concrete Care was engaged to complete the demolition phase of a major upgrade of the Sydney T1 International Terminal. Perfect employees completed all work after 9:30 pm. It required Perfect Concrete Care employees to obtain ASIC security passes. This allows