Perfect Concrete Care was engaged for road sawing works at the maintenance yard in Auburn.
All of Perfect Concrete Care’s workers are all RIW/RISI trained and inducted.
As most rail jobs, a lot of time was spent waiting on possession to progress with the cutting works. In total with all road sawing works approximately 40Lm was cut ranging from 230mm depth to 400mm depth.
All works were completed and cleaned up as per clients direction.
- Client
- Location
Auburn - Duration
2 days