Commercial Strip Out in an Airport Terminal, Brisbane

Commercial strip out in an airport terminal at Brisbane Airport: crew removing stainless bag drop unit parts on night shift, faces blurred

Project Details

Location

Brisbane Airport QLD

Client

Quadric

Duration

September 2026

The job

Quadric is a Brisbane builder working on commercial interiors and base build refurbishments. For a refurbishment inside an operating airport terminal at Brisbane Airport, they needed a crew to strip out a row of self service bag drop units and their conveyor belts, then break out the floor topping so the new work could go in.

The terminal stays open, so all of it was done on night shifts from 6.30pm, behind hoardings, with the floor protected and the work zone kept tidy for the morning.

Strip out work zone behind hoardings with floor protection boards laid in a terminal at Brisbane Airport QLD, face blurred
The work zone behind the hoardings, floor protected.
Self service bag drop unit and conveyor before strip out in an airport terminal at Brisbane Airport, screen blurred
A bag drop unit before we started.
Bag drop units and conveyor frames being dismantled in a terminal at Brisbane Airport QLD, screen blurred
Units coming apart, panels and glass first.

What the commercial strip out involved

  • Cladding boards, kiosk panels and glass removed from the bag drop units
  • Six conveyor belts and their housings dismantled and taken out
  • Steel frames and fixings stripped back to the wall framing
  • The floor topping along the old belt line broken out with jackhammers and dust extraction
  • Steel and general waste loaded out on the truck each night
Bag drop housings opened and stripped back to the frames in an airport terminal at Brisbane Airport
Housings opened up and stripped back.
Steel unit frames and wall boards exposed during a terminal strip out at Brisbane Airport QLD
Frames exposed, ready to come out.
Conveyor belts removed from a bag drop bay, floor cleared, in a terminal at Brisbane Airport
Belts out and the bay cleared.

What made it hard

It is a live terminal. Every shift started after the area was clear of the public and finished with the zone clean and secure, so the terminal could open as normal.

There was a noise restriction until 9pm. The crew did the quiet work first, stripping panels and unbolting housings, and held the breaking until after 9pm.

The terminal finishes around the work zone were new and had to stay that way. Floor protection boards went down across the area, and the crew worked on them the whole time.

Wall framing left after cladding panels and housings were removed in an airport terminal at Brisbane Airport QLD
Cladding panels off, framing left for the builder.
Bag drop belt bay cleared back to the wall during a commercial strip out at Brisbane Airport
A belt bay cleared back to the wall.

How it was done

Each shift started with a pre-start and a sign off from the builder's representative. The units were taken apart in order: panels and glass off, housings opened, belts and frames unbolted, then the steel carted out to the truck.

Once the belts were out, the crew set up a breaker with dust extraction and took up the topping along the old belt line by hand, keeping the dust inside the hoardings.

Breaker and dust extractor set up to remove a topping slab in a terminal at Brisbane Airport QLD, brands blurred
Set up to break out the topping slab, extraction on.
Floor topping broken up with a jackhammer along the old belt line in an airport terminal at Brisbane Airport, brand blurred
Topping broken up along the old belt line.
Topping slab broken out in a cleared belt bay during a terminal strip out at Brisbane Airport QLD
Topping broken out in a cleared bay.

Outcome

The bag drop units, belts and housings in the areas handed to us were stripped out and the topping broken out ready for the next trades. Nothing was left in the public areas at the end of any shift.

Crew member loading tools and waste onto a truck at night after a terminal strip out shift at Brisbane Airport, labels blurred
Loading out at the end of the shift.

Lessons learned on this job

Every job teaches the crew something. These are the ones we took from the airport.

What worked

  • Planning each night so the quiet work came before 9pm and the noisy work after
  • Floor protection laid across the whole zone before anything came apart
  • Loading out every night so nothing was left in the terminal

What was difficult

  • Working inside an operating terminal on night shift only
  • Dismantling machinery with a lot of steel and wiring in a tight space
  • Keeping dust inside the hoardings while breaking out the topping

If you have something similar

Strip outs in airports, shopping centres and other buildings that stay open need a crew that works to the site's rules and hours. Have a look at our cutting in live environments and concrete cutting Brisbane pages, see a Brisbane shop strip out at Fortitude Valley, or get in touch.

Perfect Concrete Care, your trusted concrete solutions partner

Perfect Concrete Care cuts, cores, grinds and scans concrete on commercial and industrial sites. Our technicians run current plant, work to your programme and keep dust, water and noise under control so the rest of the site keeps moving.

We work for builders, civil contractors, facility managers and government across Sydney, Brisbane and South East Queensland. Most of our work is repeat work, which is the only reference that counts in this trade. Send us the drawings or call and we will price it properly.

Talk to a real personCall now

Aboriginal and Torres Strait Islander flagsPerfect Concrete Care acknowledges the Aboriginal and Torres Strait Islander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.