Waterproofing Membrane Removal on a Hospital Plant Deck, Birtinya

Waterproofing membrane removal on a hospital plant deck in Birtinya: floor grinder and dust vacuum beside condenser units, with the ground slab next to the old coating

Project Details

Location

Birtinya QLD

Client

Frank Cole Waterproofing

Duration

March to April 2025

The job

Frank Cole Waterproofing was re-waterproofing a plant deck at a hospital in Birtinya on the Sunshine Coast. The deck carries condensers, fan units, pipework and steel plant frames, and the old coating had to come off back to clean concrete before the new membrane could go down.

Perfect Concrete Care did the waterproofing membrane removal over six day shifts in March and April 2025, with the plant staying in place and the hospital running below.

Hospital plant deck with its old waterproofing coating before grinding in Birtinya QLD
The plant deck and its old coating before we started.
Condenser plinths, access ladders and pipework on a plant deck before membrane removal in Birtinya, Sunshine Coast
Plinths, ladders and pipework to work around.
Floor grinder and industrial dust vacuum set up on a hospital plant deck in Birtinya QLD, brand blurred
March 2025. Floor grinder and vacuum set up.

What the waterproofing membrane removal involved

  • The old coating ground off the open areas of the deck with a floor grinder and dust vacuum
  • Hand grinding around condenser plinths, pipework, pipe supports and steel frames
  • Grinding under fixed access ladders and raised plant, where the floor grinder would not reach
  • The deck left ground back and clean for the waterproofing crew
Ground concrete beside an area of old coating still to be removed on a plant deck in Birtinya, Sunshine Coast
Ground slab next to coating still to come off.
Old coating ground off right up to plant pipework and a condenser base in Birtinya QLD
Ground right up to the pipework.
Hand grinding with vacuum extraction around steel plant frames on a hospital plant deck in Birtinya, Sunshine Coast
Hand grinding around the steel frames.

What made it hard

The plant stayed in place. Condensers, fans, pipework and frames sit all over the deck, so large parts of the floor could only be reached with hand grinders, working around and under the equipment.

It is a hospital. The work area was protected, permits and the site SWMS were signed each day, and the dust was captured at the grinder so none of it went into the plant or down the building.

The deck is enclosed by screens, so the gear had to be brought up and worked in tight corridors between the units.

Crew member grinding the old membrane under a fixed access ladder on a plant deck in Birtinya QLD
Grinding under a fixed ladder.
Vacuum hose on a part ground plant deck between plinths and pipes in Birtinya, Sunshine Coast
Working between the plinths and pipes.

How it was done

The crew ran a walk behind floor grinder with a dust vacuum across the open walkways and bays first, then went back in with hand grinders and vacuums for the edges, plinths, pipes and frames.

Each area was ground back to clean concrete and left tidy, ready for Frank Cole's new membrane.

Plant deck walkway ground back to concrete beside an access stair in Birtinya QLD
The walkway ground back to concrete.
Concrete slab ground clean under steel plant frames in front of fan units in Birtinya, Sunshine Coast
Ground clean under the frames.
Slab ground clean around a pipe support and flexible connection on a plant deck in Birtinya QLD
Clean edges around a pipe support.

Outcome

The plant deck was handed back to Frank Cole ground back to concrete around all the plant, ready for the new waterproofing system.

Plant deck ground back in front of condenser fan units ready for new waterproofing in Birtinya, Sunshine Coast
Ready for the new membrane.
Slab ground back under a raised condenser unit on a hospital plant deck in Birtinya QLD
Ground back under a condenser unit.

Lessons learned on this job

Every job teaches the crew something. These are the ones we took from Birtinya.

What worked

  • Floor grinder for the open areas first, then hand grinders for everything around the plant
  • Dust captured at the grinder, which matters on a hospital
  • A vacuum on every grinder, floor and hand held

What was difficult

  • Working around and under plant that stayed in place
  • Tight corridors between condensers, frames and screens
  • Hand grinding a large share of the deck

If you have something similar

Plant decks and roofs with equipment in place need careful membrane removal before re-waterproofing. Have a look at our concrete grinding Sunshine Coast and waterproofing membrane removal Brisbane pages, see similar jobs at Coorparoo and Caloundra, or get in touch.

Perfect Concrete Care, your trusted concrete solutions partner

Perfect Concrete Care cuts, cores, grinds and scans concrete on commercial and industrial sites. Our technicians run current plant, work to your programme and keep dust, water and noise under control so the rest of the site keeps moving.

We work for builders, civil contractors, facility managers and government across Sydney, Brisbane and South East Queensland. Most of our work is repeat work, which is the only reference that counts in this trade. Send us the drawings or call and we will price it properly.

Talk to a real personCall now

Aboriginal and Torres Strait Islander flagsPerfect Concrete Care acknowledges the Aboriginal and Torres Strait Islander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.